Emergency Department at Bristol Hospital

Bristol, Connecticut, USA

Designed to accentuate the quality of services provided by Bristol Hospital’s Emergency Department, the 7,722-square-foot renovation combined with a 16,190-square-foot addition of 14 beds in 13 rooms allows staff members at the state-of-the-art medical building to continue providing patients with high-quality care. Kawneer’s 1620UT System™1 Curtain Wall, Trifab® VersaGlaze® 451T Framing System and Trifab® 400 Framing System products were used to help soothe and envelope patients in a sense of comfort upon arrival and emphasize the focus on patients and staff who would fill the space.

ARCHITECT: Phase Zero Design, Hingham, MA
GLAZING CONTRACTOR: Advanced Performance Glass East, Hartford, CT
GENERAL CONTRACTOR: Bismark Construction, Milford, CT

Photography: ©Elisif Photography